Contact us for a quote now
Telephone: 08 9434 9474
Email: info@ramfab.com.au

Butler College

Date: August 2014

RAM Fabrication is about to embark on a new contract for Butler College through builder, Perkins.

Stage 2 of the project includes a two storey Year 7 & 9 Learning Block, plus another two-storey Senior School Learning Block, an extension to the existing Sports Hall and minor works to the existing stage 1 learning areas. The new facilities include a 90 seat fixed tiered seating Auditorium, Visual Arts Studios, Media Recording Studios, Music Learning Areas, Information Technology Studios and Specialised Learning Areas.

RAM Fabrication has been awarded the Architectural Metal Work component which includes manufacturing and installing items such as Balustrading, Handrails, Gates, Screens, Bollards and various other custom metal items.

At completion of the project, Butler College will accommodate a community of over 1,500 students comprised of year 7-12 mainstream as well as high needs education support students.

RAM Fabrication looks forward to working on this exciting project which will meet important educational needs in the northern suburbs of Perth.